Call us
+86 158 0060 8292

How To Install Shell Scheme Booth?

Views:19     Author:william     Publish Time: 2017-02-13      Origin:Site

shell scheme installation.jpg

Shell Scheme Booth Installation Process:

  • connect beam(950mm) and post(2480mm) with tool.

  • put the pvc panel between the beams and post(2480mm) with 3 tension lock.

  • Do not forget install the adjustable foot under the post.

  • connect the pvc panels one by one.

  • install the sign panel, and the booth is finished.

Shanghai Chleh Exhibit Industry Ltd. was founded in 2008, after twelve years of steady development, we have been a leading manufacturer of exhibition and event products in eastern China.

Connect Socially

Certification Qualification

Get In Touch

Address: B701,No.5 Building,1188 JiangYue Road,Shanghai,China.
Tel: 86 21 68319251
Mob: +86 158 0060 8292         
Email:  mike@clexhibit.com​